Print works combine continuous ink-and-solvent exposure, paper-dust accumulation, and high-pressure-roller operations — producing PTV briefs with both wet-and-residue and contaminated-dry considerations.
Tier 2 · Industrial Adjacent
Every print works site has a distinct surface vocabulary that drives the testing protocol. We test the actual surfaces present, not a generic baseline.
Painted concrete in press hallsink-residue resistant
Resin coatings around pressestested representatively
Anti-slip aggregate near solvent-handlingwet-and-chemical exposure
Concrete with chemical-resistant sealer in ink-storagetested representatively
Generic slip testing misses the zones that actually generate incidents. Print Works sites have distinct high-risk zones that warrant independent testing.
Ink residue on surrounding floor.
Localised wet-and-chemical exposure.
Fine-particulate slip exposure.
Print works slip testing operates under HSE INDG225, COSHH 2002, and DSEAR 2002. UKAS ISO/IEC 17025 reports support HSE compliance.
Whether you operate a single industrial site, a multi-site portfolio, or an FM contractor brief covering multiple operators, we'll return a fully-costed, no-obligation quotation within one working day.
Mon–Fri, 8am–6pm office hours.
23:00–05:00 attendance for production-floor sites by arrangement.